| |
|
PRODUCTION FACILITIES
- Main office
- Forging shop
- Metal treatment,
cutting and bending shop
Full complex of facilities for steel cleaning, cutting and bending.
- Section assembling
shop
- Shiprepair
shop
- Piping shop
- Outfitting
shop
- Hull forming
shop
- Shipbuilding
complex "Yantar"
Two building places: L=306 m, W=24 m.
Cranes: 2 x 30 t, 5 x 80 t.
Shipbuilding complex "Yantar" allows building vessels with launching weight up to 12000 ton.
Building hall:
Four slipways L=110 m, W=42 m.
Cranes: 6 x 30-90 t. (Free height under crane hook 30 m)
- Mechanical
engineering shop
- Aluminium
alloys production shop
- Shipbuilding
complex "Burevestnik"
Three building places: L=164 m, W=16m.
Cranes: 2 x 20 t, 2 x 30 t.
- Floating
Dock No. 8
Dock No. 8: 150 x 29 m, 12000 t.
- Floating
Dock No. 2
Dock No. 2: 131 x 22,5 m, 6000 t.
- Vessel's
power plant trial shop
- Piers
Piers of 1500 m long in total.
Cranes along the piers for ship's service: 9 x 20 t.
Tugs: 2 x 1200 hp, 1õ 160 hp, 1õ 150 hp.
Floating crane: 100 t.
|